Commercial Project

IT Office Complex, Tidel Park

Full building automation with BMS integration, 32-camera CCTV, biometric access control and a real-time energy dashboard.

LocationTidel Park, OMR, Chennai
TypeCorporate Office
Area18,000 sq. ft.
Duration8 Days
IT Office Tidel Park
42%
Energy Saved
32
Cameras
12
Access Points

The Challenge

This 3-floor IT company had completely manual lighting and AC systems. Every floor had lights running 24/7 regardless of occupancy. There were no usage analytics, no access logs, and security cameras were analogue with poor night vision. The facilities team had no visibility into where energy was being wasted.

Our Solution

We integrated a full BMS (Building Management System) with occupancy-based lighting across all floors. Motion sensors cut lighting in unused zones within 10 minutes of vacancy. HVAC was tied to working hours and occupancy thresholds. A 32-camera IP CCTV system replaced the old analogue setup, with a live dashboard accessible from any browser. Biometric access panels were installed at 12 entry points with full audit logging.

Devices & Systems Used

BMS Controller
24 Motion Sensors
32 IP Cameras (4K)
12 Biometric Panels
HVAC Automation Modules
Energy Analytics Dashboard
64TB NVR Storage
Perimeter Alarm System

Project Outcome

42% reduction in electricity costs in the first quarter. The facilities team now manages all 3 floors from a single web dashboard. Access logs have been used twice to resolve HR disputes. The IT director called it 'the best infrastructure investment we made this year.'